-
Bombardier
Install a breathing air line in the
paint shop, and perform other piping
and mechanical work
-
Rolls-Royce
Install a boiler and execute several
other fixed price and time and material
contracts, install production equipment,
structures, etc.
-
Canada Post
Reinforce trusses and perform structure
work on several occasions
-
Mailhot
Industries
Install structures and a new production
line
-
Crown
Conseal
Install several conveyor lines and
structures
|
Graymont |
Graymont |
|
- Loto-Québec
Install four coolers and upgrade the
cold water system’s plumbing
- Saint-Hyacinthe
CEGEP
Install a boiler and a cooler
- Bridgestone
Firestone (Joliette)
Make modifications;
install a mechanical system and piping
-
Buanderie de Montréal
Perform time and material work and install
a cooling system
- City
of St. Léonard Arena
Heating restoration
- Petrochemical
Companies (Coastal and Pétromont)
Various plumbing/piping and mechanical
work
- Pratt
& Whitney
Install structures and perform mechanical
outfitting
- Groupe
SCV inc.
Install a cooling tower in St. Antoine
|
|

Loto-Québec |

St. Hyacinthe CEGEP |
|